Our 2024 summer maintenance occurred on June 28th, and we we have pictures to share.
Thanks to Shane Muyers on the equipment and Dom Couve, Norman Merlo , Kevin Gagne and Eugene Gervais for their hard work!
Range B is now 95m to the target board, and Range H has also been extended to 100m once a target is installed.
- Range E
- Range G
- Range F
- Range D
- Range B
- Range A
- Range A
- Range B
- Range C
- Range C
- Range D
- Range E
- Range F
- Range F
- Range G
- Range G
- Range H Structure
- Range H
- Range H
- Range H New Berm





















